Lots has been going on. Aileron cables are in, flaps springs installed with the gasket. Pitot tube mast is installed, pitot and AOA plumbing are done. Inspection cover back plates are installed with all the nut plates for the covers to attach. Gas tank cover has all the holes upsized for #6 screws. Curtis drain hole has been cut. Trailing edges of the flaps and ailerons are all lined up and riveted